An MVP that takes 6 months wasn't an MVP — it was a v1. Use this template to lock scope, define what proves it worked, and what triggers a pivot.

The skeleton

MVP SCOPE: [Product / feature name]
Owner: [Name] · Engineering pair: [Name] · Target ship: [date]
Today's date: [YYYY-MM-DD] · Build window: [N weeks]

1 · THE BET (1 sentence)
"If we ship [thing] for [customer], they will [behaviour] within [time window]."

Example:
"If we ship a single-corridor IN→UAE payroll API for SMBs paying ≤ 50 employees, they will run at least one full payroll cycle through us within 30 days."

2 · BUILD (must-have for the bet to be testable)
- [Capability 1] — minimum acceptable: [what "done" looks like]
- [Capability 2] — minimum acceptable: [...]
- [Capability 3] — minimum acceptable: [...]
- [Capability 4] — minimum acceptable: [...]
- [Capability 5] — minimum acceptable: [...]
(Cap at 5–7. If you're at 12, you're not building an MVP.)

3 · WON'T BUILD (explicit cut-list)
- [Tempting feature 1] — defer to v1.1 because [why]
- [Tempting feature 2] — defer because [why]
- [Tempting feature 3] — never because [why]
- [Edge case 1] — handle manually for first 10 customers
- [Edge case 2] — block in UI; "coming soon"
- [Integration 1] — wait for v2

4 · SUCCESS CRITERIA (3 numbers, 1 timeframe)
By [date], we should observe:
- [Metric 1, e.g. activation rate]: ≥ [number]
- [Metric 2, e.g. retention week 4]: ≥ [number]
- [Metric 3, e.g. NPS or qualitative]: [target or threshold]

If we hit ≥ 2 of 3: we double down — write a v1 plan, hire ahead.
If we hit 1 of 3:    we iterate — adjust scope, re-test for 4 more weeks.
If we hit 0 of 3:    we pivot or kill — decision in 2 weeks.

5 · KILL CRITERIA (the brutal honesty)
Conditions under which we WILL kill, before reaching the success window:
- [Condition 1, e.g. acquiring 0 paying customers in first 30 days]
- [Condition 2, e.g. average activation <10% across 100 signups]
- [Condition 3, e.g. NPS < 0 from first 20 users]

6 · OPEN ASSUMPTIONS (what could break this)
- Assumption 1: [we believe X is true; we'll know within Y weeks]
- Assumption 2: [...]
- Assumption 3: [...]

7 · ROLLOUT
- Internal dogfood: week [N]
- 5 paying design partners: week [N+2]
- Open beta: week [N+4]
- Pricing live: week [N+6]
The cut-list is the document. "What we won't build" is more important than "what we will build". The discipline of writing it forces team alignment and prevents scope creep.

Most-common MVP scope mistakes

Related skeletons

PRD skeleton →Zoomed-in version per featureCustomer interview script →To validate "the bet"